10% OFF SALE! Use Coupon Code 10OFF50 ($50 minimum).
  • butler mfg company 1967 put up building use pert timetable vintage ad

Original 1967 Houston business magazine vintage ad for the BUTLER MANUFACTURING COMPANY.  Main office and factory was located at 1403 South Loop West, Houston, Texas.  How long does it take to put up a Butler Building if you use PERT Timetable?  One hundred working days, 20 weeks. Thats all it took for this 95,000 square foot plant from ground breaking to completion. Shown in the picture is the Butler Building built for the Tysaman Machine Company, of Knoxville, TN. ​This old dated one page trade magazine advertisement would display beautifully matted and framed.

butler mfg company 1967 put up building use pert timetable vintage ad

  • Product Code: zi187
  • Length: 11 inches
  • Width: 8 inches
  • Pages: 1
  • Views: 31
  • Availability: In Stock
  • $20.00
  • $15.00

    ON SALE
    25% OFF

  • You save: $5.00 (25%)

Estimate Shipping