Search - vintage vintage
Products meeting the search criteria
Flour City Brush Company 1956 vintage dairy catalog utility tank can
Original dairy trade vintage catalog for FLOUR CITY BRUSH COMPANY more. Main office and plant was located at 1501 4th Avenue South, Minneapolis, MN. and The Pacific Coast Brush Company, at 1507 Sante Fe Avenue, Los Angeles, CA.Manufacturers of Dairy Brushes. The finest brush made for Milk Plants, Creameries, and Ice Cream Plants. Products include Sanitary Titan Tank Brush, Titan Utility Brush, Titan Milk Can Brush and the Titan Tank Brush shown. Has numerous product images with detailed descriptions, uses, applications and dimensions provided. Unbound fr less
$26.00 $19.50
Flour City Ornamental Iron Company 1958 vintage windows catalog metal
Original windows trade vintage catalog for THE FLOUR CITY ORNAMENTAL IRON COMPANY more. Main office and plant was located at 2637 27th Avenue South, Minneapolis, MN. Since 1893.Manufacturers of Metal Windows. Products include Reversible Window, Reversible Window with Hopper Ventilator, Reversible Window with Projected Ventilator, Reversible Window with Casement, Projected, Fixed, Hopper, Folding Window, Double Hung Window, Single Hung Window and Sliding Windows are featured. Has numerous product images with detailed descriptions, uses, applications, specification less
$45.00 $33.75
Flour City Ornamental Iron Company 1961 vintage window catalog metal
Original 1961 window trade vintage catalog for the FLOUR CITY ORNAMENTAL IRON COMPANY more. Main office and plant were located at 2637 27th Avenue South, Minneapolis, MN. Manufacturers of Metal Windows of Aluminum, Bronze and Stainless Steel. Windows include Reversible, Folding, Projected, Hopper, Single Hung, Double Hung, Casement, Top Hinged, Fixed and Combinations, all are fully featured.Has numerous product image, detailed illustrations, description, applications and specifications provide product info. Unbound from a large rare 1961 Architectural Catalog File, this uniq less
$45.00 $33.75
flour mills of america inc 1958 famous brands bakery supply vintage ad
Original commercial bakery trade magazine vintage ad for FLOUR MILLS OF AMERICA, INC in Kansas City, MO more. Millers of famous brands, finest flours. Made-Rite, Old Gold, Cockade, Big 7, Super Bake, Sleepy Eye Chief, Scout, Brave, Dainty, Excellence, Dandy. 1958 unique old baking supply industry advertisement. About six issues of this rare magazine was found in a storage unit, in their original, rolled paper mailing sleeve addressed to Frieds Bakery in Mountaindale, New York. These magazines were folded in half, unopened for 55 years. As such, the bakery ads may have a slight cr less
$24.00 $18.00
Flow Control Equipment Inc 1998 vintage oil gas catalog oilfield
Original 1998 Oil and Gas trade vintage catalog for FLOW CONTROL EQUIPMENT, INC more. (A Wholly Owned Subsidiary of J.M. Huber Corp). Main office was located at 14011 Park Drive, Tomball, TX. The plants were located in Tomball and Borger, TX. Manufacturers of Oilfield Equipment.Has product image, illustration, description, application and specifications provide product details. Unbound from a large rare 1998-1999 Composite Catalog, this unique old eight-page technical brochure would display beautifully matted and framed. Awesome cover graphics. A fabulous addition to yo less
$40.00 $30.00
flow meter engineering handbook brown instrument co vintage
Hard covered book titled FLOW METER ENGINEERING HANDBOOK. 1936 Edition, Published by The Brown Instrument Company more. Division of Minneapolis-Honeywell Regulator Company, Philadelphia, PA, 1936, 162 pages, illustrated, has many tables. Sections include: GENERAL FLOW METER ENGINEERING ORIFICE DESIGN STEAM FLOW MEASUREMENT WATER FLOW MEASUREMENT LIQUID FLOW MEASUREMENT AIR & GAS FLOW MEASUREMENT GENERAL TABLES & DATA SUMMARIES OF SYMBOLS, EQUATIONS, AND TABLES. This book is in VG condition. Pages clean and intact. There is a previous owner's name written on the co less
$43.00 $32.25
flowers from frost to frost 1906 henry maxwell garden vintage article
Original vintage magazine article titled FLOWERS FROM FROST TO FROST more. A Garden That is Famous For Its Uninterrupted Succession of Flowers - Some of the Best Combinations That May Be Reproduced in Any Garden by Henry Maxwell, Photographs by Henry Troth and Thomas Watson Sears. The famous Italian garden of Captain Larz Anderson at Brookline, MA. furnishes the best example in America of a garden which maintains a permanent display of flowers from April to November. The gardener is Mr. Duncan Finlayson. Old 1906 gardening article. 4 pages. less
$8.99 $6.74
flowers outdoors christmas time 1906 ny winter garden vintage article
Original vintage magazine article, FLOWERS OUTDOORS AT CHRISTMAS TIME more. The Marvellous Christmas Rose, Which Blossoms in the North, Amid or Under The Snow, Any time from November to March, without any Protection whatever - other Hardy Winter Flowers by Wilhelm Miller, Photographs by Nathan R. Graves and A. Radclyffe Dugmore. There is a picture on one page of Christmas Roses blooming outdoors beneath the snow at Rochester, New York, January 13th, 1906. Old 1906 country home gardening article. 4 pages.approximate size 10 x 14 inches. less
$7.99 $5.99
Flowline Corp 1960 vintage industrial catalog welding fittings
Original 1960 industrial trade vintage catalog for the FLOWLINE CORPORATION more. Main office and plant were located in New Castle, PA. Manufacturers of Welding Fittings of Stainless Steel, Monel, Nickel and Aluminum.Has product images, description, applications and specifications to provide product details. Unbound from a large rare 1960 Process Industries Catalog, this unique old one-page technical brochure would display beautifully matted and framed. Nice graphics. A fabulous addition to your retro industrial welding equipment library. less
$40.00 $30.00
Flowline Corp 1964 vintage industrial catalog welding fittings
Original 1964 industrial trade vintage catalog for the FLOWLINE CORPORATION more. Main office and plant were located in New Castle, PA. Manufacturers of Flowline Welding Fittings. 'Stainless Steel, Monel, Nickel and Aluminum'. 'Use FLOWLINE Welding Fittings - Reduce Piping Fabrication Costs.Has product images, description, applications and specifications to provide product details. Unbound from a large rare 1964 Process Industries Catalog, this unique old one-page technical brochure would display beautifully matted and framed. Nice graphics. A fabulous additio less
$40.00 $30.00
Fluid Control Inc 1967 vintage oil catalog oilfield degasser Fluco
Original 1967 Oil and Gas trade vintage catalog for the FLUID CONTROL, INC more. Main office was located at 1108-500 Jefferson Building, Houston, TX. Branch office was located in Lafayette, LA. Manufacturers of Oilfield Equipment. Products include Fluco Unitized Drilling Fluid Degasser, fully featured. The Fluco drilling mud degasser is designed to effectively remove entrained gas from oil well drilling fluids utilizing its own mud pump and prime mover. Engineered with a minimum of moving parts, proper installation and maintenance will insure dependable, tr less
$40.00 $30.00
Fluid Energy Processing Equipment Company 1960 vintage catalog
Original 1960 industrial trade vintage catalog for the FLUID ENERGY PROCESSING & ENERGY COMPANY more. (Formerly known as the Wheeler-Stephanoff Mill). Main office and plant were located at Richmond & Norris Streets, Philadelphia, PA. Manufacturers of the Jet-O-Mizer - Grinds more Products to Finer Particle Size with Greater Uniformity.Has product image, illustration, description and applications to provide product details. Unbound from a large rare 1960 Process Industries Catalog, this unique old one-page technical brochure would display beautifully matted and framed. Nice graphics less
$40.00 $30.00
Fluid Kinetics Corp 1974 vintage oil gas catalog oilfield dampeners
Original 1974 Oil and Gas trade vintage catalog for the FLUID KINETICS CORPORATION more. Main office and plant were located at 1343 Callens Road, Ventura, CA. Manufacturers of Oilfield Equipment. Products include Fluid Kinetics Pulsating Dampeners, which is fully featured.Has product image, illustration, description, application and specifications provide product details. Unbound from a large rare 1974-1975 Composite Catalog of Oil Filed Equipment and Services, this unique old one-page technical brochure would display beautifully matted and framed. Nice graphics. A fabu less
$30.00 $22.50
Fluid Kinetics Corp 1981 vintage oil catalog oilfield pump equipment
Original 1981 Oil and Gas trade vintage catalog for the FLUID KINETICS CORPORATION more. Main office and plant was located at 1343 Callens Road, Ventura, CA. Manufacturers of Oilfield Pump Equipment. Products include Pump Discharge Pulsation Dampeners and Pump Suction Stabilizer Separator, both are fully featured.Has product images, illustrations, description, application and specifications charts to provide product details. Unbound from a large rare 1980-1981 Composite Catalog, this unique old two page technical brochure would display beautifully matted and framed. Ni less
$40.00 $30.00
Fluid Kinetics Corp 1984 Vintage Catalog Oil Stabilizer Separator
Original 1984 Oil and Gas trade vintage catalog for FLUID KINETICS CORPORATION more. Main office and plant was located at 2368 Eastman Avenue, Ventura, CA. Manufacturers of Pump Suction Stabilizer / Separator. Unbound from a large 1984-1985 Composite Catalog of Oil Field Equipment and Services, this unique old one page technical brochure / advertisement would display beautifully matted and framed. A fantastic addition to your retro petroleum industry library. less
$30.00 $30.00
Fluid Packed Pump Company 1930 Vintage Ad Oil Field Friction Operation
Original oil and gas trade magazine vintage ad for FLUID PACKED PUMP COMPANY of Los Nietos, CA more. Friction, The Grey Spectre That Hovers Over The Operation of All Tight Fitting Pumps. Unique 1930 old oilfield petroleum equipment magazine advertisement. Nice graphics. less
$20.00 $15.00















